Update - 5/3/24
Fox Glen Dr Area (Fox Glen Dr, Fox Glen Ct, Glenbriar Dr, Glenbriar Ct, and Glen Eagles Ct)
Fox Glen Dr Area (Fox Glen Dr, Fox Glen Ct, Glenbriar Dr, Glenbriar Ct, and Glen Eagles Ct)
The contractor will be paving this Friday, May 3 and final restoration will follow.
This week, the contractor is expected to begin mobilizing in town in the Fox Glen Dr area (Fox Glen Dr, Fox Glen Ct, Glenbriar Dr, Glenbriar Ct, and Glen Eagles Ct) and later in the week in the Forest Ridge/Huntington area (Forest Ridge Rd, Huntington Rd, Essex Ct, Sterling Ct, and Foxhill Ct). Initial construction activities will include posting of “Road Construction Ahead” (RCA) signs and concrete saw-cutting for spot repairs.
A preconstruction meeting was held with the contractor this week. A project schedule with street-specific phasing is still being finalized. Resident notification letters will be mailed out with more information regarding the project on 4/19. Next week, the contractor is expected to provide a project schedule for the phasing of work throughout town.
On Tuesday, October 17, the portion of Riverside Avenue (IL Rt. 25) that was impacted by the Riverside Lift Station Project was re-opened.
Week of October 16
Monday, 10/16/23 - Curb and sidewalk poured adjacent to the pavement replacement
Tuesday, 10/17/23 - Concrete pours in the prepared roadways sections.
Wednesday, 10/28/23 - additional pour if needed
Three days required for concrete to set-up
Week of October 23
Monday, 10/23 - remove curb, sidewalk and pavement
The work on all streets for this project has been substantially completed. The Contractor will be continuing to perform final cleanup, landscaping, and other minor “punchlist” tasks in the upcoming weeks.
Please see attached document on the right side of this project page for lawn care recommendations after construction.
East Side Streets