Update - 9/2/21

The intersection of Roosevelt and Elm will be closed for a few hours on Thursday morning. Please plan your travel route accordingly.

If you have any questions, please call Todd Wells with Engineering Enterprises, Inc. at 773-454-4214 or City Department of Public Works at 630-377-4405.

Update - 8/27/21

Next week the Contractor will be installing sanitary sewer, storm sewer and water
main at the locations noted on the map. Additionally, new sanitary sewer
services will be constructed throughout the week for the following lots:


• 21 Roosevelt
• 25 Roosevelt
• 27 Roosevelt
• 29 Roosevelt
• 31 Roosevelt
• 33 Roosevelt
• 65 Roosevelt
• 83 Roosevelt


Residents at these addresses can maintain normal water use.

The intersection of Roosevelt and Elm will be closed Monday afternoon.

Update - 8/27/21

Anticipated work for the week of 8/30 

* Please note - all work is weather dependent 

Grading and place stone for bicycle path and sidewalk north of Illinois 

Set the pedestrian bridge at the north project limit and pour the concrete deck and approaches

Pour curb and gutter on Illinois Avenue 

Final grading and top soil placement

Update - 8/20/21

Next week the Contractor will be installing sanitary sewer and water main at the locations noted on the map.  Additionally, new sanitary sewer services will be constructed throughout the week for the following lots: 

  • 21 Roosevelt
  • 25 Roosevelt
  • 27 Roosevelt
  • 29 Roosevelt
  • 31 Roosevelt
  • 33 Roosevelt
  • 57 Roosevelt
  • 61 Roosevelt

Residents at these addresses can maintain normal water use. 

Update - 8/19/21

Anticipated work for week of 8/23 

Please note:  All work is weather dependent

Permanent restoration with seed and blanets along the creek banks 

Continue stone armoring along the creek banks 

Grading and place stone for bicycle path north of Illinois 

Framing and pouring concrete foundations for the pedestrian bridge at the north project limit 

Structure adjustments in the street on Indiana Avenue and Walnut Avenue 

Update - 8/16/21

Next week the Contractor will be installing sanitary sewer at the intersection of
Roosevelt St. and Elm St. Due to the nature of the work, the intersection of
Roosevelt and Elm will be closed on Monday and Tuesday. Additionally, new
sanitary sewer services will be constructed throughout the week for the following lots:

• 20 Roosevelt
• 24 Roosevelt
• 28 Roosevelt
• 30 Roosevelt
• 32 Roosevelt
• 34 Roosevelt
• 36 Roosevelt
• 38 Roosevelt
• 45 Roosevelt
• 57 Roosevelt
• 61 Roosevelt

Update - 8/16/21

Contractor will be installing sanitary sewer at the intersection of Roosevelt St. and Elm St. Due to the nature of the work, the intersection of Roosevelt and Elm will be closed on Monday and Tuesday. Additionally, new sanitary sewer services will be constructed throughout the week for the following lots:

Update - 8/9/21

The Contractor will continue west with the sanitary sewer next week. A
map of the approximate work zone is attached. Construction is a moving
operation; therefore, the work zones will change daily.

On-street parking will be prohibited in the work zone. Residents with
driveways within the active work zones are asked to relocate their car(s) to
an available location on Roosevelt Street or to a side street by 7 AM.

Update - 7/31/21

The Contractor will continue west with the sanitary sewer and water main.
A map of the approximate work zone of each operation is attached.
Construction is a moving operation; therefore, the work zones will change
daily.

Roosevelt Street will be reduced to one lane adjacent to active
construction. Flaggers will be present to control and direct traffic as
needed. On-street parking will be prohibited in the work zone. Residents
with driveways within the active work zones are asked to relocate their